Qld Flood Road Recovery

The Queensland Flood Road Recovery was a huge task to execute both logistically and administratively. The remote locations of the project meant that communication needed to be seamless. UniPhi’s web-based portfolio management software was implemented as an electronic collaboration method, replacing traditional paper-based systems.

This lead to improved contract admin procedures that saved time, resources and money and which also helped enforce the success of the project.

 
 
farnorth.jpg
 

Background

The NDRRA program is a joint State / Commonwealth disaster response and recovery assistance program, with the Queensland Government accessing the funds to reconstruct the thousands of kilometres of road damaged by a string of natural disasters to hit the state in 2010 and 2011, including devastating flooding and cyclones.

As the Program Manager, SKM will be responsible for the management of construction of numerous Restoration Work Packages for each of the three regions. Packages include the reconstruction of hundreds of kilometres of damaged roads and associated infrastructure such as bridges and drainage. SKM is a leading projects firm, with global capability in strategic consulting, design and delivery, serving the Buildings and Infrastructure, Mining and Metals, Power and Energy and Water and Environment sectors.

 

The Challenge

SKM were tasked with managing over $800m of road restoration in three of the remotest regions of Australia. The difficulty in being able to track a program of works across such a vast and lightly populated area is significant. Traditional project management methods included triplicate hardcopies of documents and centralised reporting meant an excel spreadsheet that was 3 months behind where the program actually was at.

 

The Solution

Deploy a web based product and estbalish 3G towers on project sites to enable project office communication back to the PMO hub based in Brisbane.

UniPhi managing director Mark Heath discussed UniPhi’s contribution to SKM’s program management efforts in Queensland. “UniPhi’s integrative nature means that most aspects of the program work can be handled in one system. A single system means that communication is open and streamlined while data entered need only be entered once and used many times.

Reports, documents and dashboards can be generated, and populated with this data, at the click of a button. Information can be pulled from, for example, the contracts, issue or resource areas of the application to produce an overview of the program , or a more focused update of a single package.

UniPhi’s template system means that templates have been created that match Queensland’s Department for Transport and Main Roads (TMR) contract administration templates.

Another huge benefit provided by the use of UniPhi is its high level of configurability. SKM is required by the Queensland Government to report monthly on a number of metrics from ‘Percentage of Road Network Closed’, ‘Percentage of Impacted Road Network Recovered’ to the number of ‘Community Meetings / Information Sessions’. Through the use of custom fields, defined by SKM, UniPhi can be moulded to suit their requirements.”

UniPhi is supporting SKM in:

  1. Document Management

  2. Issue & Risk Management

  3. Resoure Management

  4. Project Cost Management

  5. Procurement and Contract Administration

  6. Change Control

  7. Communication and Stakeholder Management